Francis Turbine Test Rig

Description

Experiment:
  • To study the operation of a Francis Turbine
  • To determine the Output Power of Francis Turbine
  • To determine the Turbine Efficiency
Utilities Required:
  • Water Supply and Drain
  • Electricity 15 kW, 440V AC, Three Phase
  • Floor Area 1.5 x 0.75 m

Reviews

There are no reviews yet.

Be the first to review “Francis Turbine Test Rig”

Your email address will not be published.