Description
Experiment:
- To study the operation of a Francis Turbine
- To determine the Output Power of Francis Turbine
- To determine the Turbine Efficiency
Utilities Required:
- Water Supply and Drain
- Electricity 15 kW, 440V AC, Three Phase
- Floor Area 1.5 x 0.75 m





Reviews
There are no reviews yet.